1.
Motor housing aluminum extrusions processing after receiving the processing instruction, it is necessary to understand the meaning of the processing drawing, recheck whether the data displayed in the drawing is consistent with the data, and then handle the collection procedures under mild conditions. If in doubt, feedback to the superior.
2. According to the type and specification of the materials listed in the list. After the color is checked and signed by the warehouse keeper, check the quantity in the list and check the aluminum profile specifications before receiving. Appearance quality: no corrosion, oxidation, scratches and other defects on the external surface. Curved profiles are processed after inspection by inspectors.
3. Saw the conventional angle aluminum profile. According to the operating specifications of the sawing machine, motor housing aluminum extrusions debug the sawing machine with a double-ended aluminum knife, and try to cut a sawing machine according to the profile layout table, and check the length, angle, surface and so on before self-checking the batch sawing. Sawing 45-degree or 135-degree Angle aluminum profile: first use a double-ended saw to cut materials, and then use a single Angle aluminum profile cutting machine according to the drawing angle debugging saw cutting machine, check the self-checking length, angle, surface.
4. According to the requirements of the drawings, the motor housing aluminum extrusions will need to be drilled and milling after sawing the workpiece, the product transfer car will be transferred to the processing area for CNC processing, and then drilling and milling groove. For the parts with fewer notches or relatively simple, drilling on the ordinary drilling and milling machine should be debugged in accordance with the operating procedures of the saw milling machine. Before drilling and milling groove processing, it should meet the requirements of mutual inspection procedures, and check the processing parts of the previous process to see if there are errors and prevent the occurrence of unqualified products. At the same time, develop self-inspection requirements to prevent nonconforming products from entering the next process.
5. For the processed products, the product transfer vehicle will transfer the products to the product waiting area for product inspection. The quality inspection personnel shall inspect the products according to the requirements of the drawings and product inspection specifications to ensure the qualified rate of the outgoing products.
6. Check the qualified products, transport the products to the product packaging area with the product transport vehicle for product packaging, and choose the protective film according to the product surface treatment method. When packing, the protective film should be flat on the product, there should not be too many bubbles, otherwise the protective film is easy to fall off. Pay attention to protect the product during the packaging process to avoid scratching the product during the packaging process.